
MATERIAL CALCULATOR
Estimate cement, steel and more.
Approximate material quantities for your built-up area using common thumb rules for RCC-framed homes.
YOUR BUILD
Built-up area.
Thumb rules for a typical RCC-framed home. Your engineer’s bill of quantities is the final reference.
APPROXIMATE QUANTITIES
FAQS
Frequently asked questions
How is the construction cost calculated?
Built-up area multiplied by the package rate, plus items such as basement, compound wall, borewell or elevation features that are priced separately.
Is plot area the same as built-up area?
No. Built-up area is the covered floor area across all floors, including walls, stairs and balconies. Setbacks reduce what you can cover.
What is a wallet or allowance amount?
A budget per item, such as tiles or fittings. Choose within it or pay the difference for an upgrade.
Are there hidden costs?
Everything in scope is listed in the contract. Approval fees, utility connections and changes you request are shown as separate lines.
Ready to turn your plans into a home?
320+Quality checks
100%Milestone-safe payments
6NCR cities
Package rates and offers are indicative and may vary by city, plot and specification. Your final price, inspections and warranty terms are set out in your signed agreement.